Twycross Zoo Gibbon Forest
The installation process, led by the Turtle Productions team, commenced with the placement of 250gsm Geotextile. Sections of this material were seamlessly welded together using a heat gun, forming a solid base for the subsequent installation of Elevate PondGard. A total of 3800m2 of Elevate PondGard, supplied in various roll widths, was used in conjunction with ample QuickSeam Splice Tape and Quickprime Plus to achieve 335 running meters of jointing.
The chosen Pond Liner for this project was the 1.0mm Elevate EPDM PondGard. Notably, Elevate QuickSeam products were employed to expertly join the pond liner sheets and create inlet/outlet terminations, showcasing a meticulous approach to ensuring the durability and effectiveness of the gibbon forest habitat.
Read the complete story of the Gibbon Forest Constuction here