Phosphorus Removal Reed Bed System – ARM Group Project

Phosphorus Removal Reed Bed System – ARM Group Project

Project Showcase Reed Bed (Wetland) Project Showcase Reed Bed (Wetland) Phosphorus Removal Reed Bed System – ARM Group Project In September 2024, ARM Group Ltd installed a phosphorus removal reed bed at a Severn Trent Water site. This engineered wetland was...
EPDM Lined Wildlife Lake – Fairwater Project

EPDM Lined Wildlife Lake – Fairwater Project

Project Showcase Wildlife Lake Project Showcase Wildlife Lake EPDM Lined Wildlife Lake – Fairwater Project Fairwater Ltd delivered an EPDM Lined Wildlife Lake at The Wildwood Estate in the Surrey Hills. The project transformed a 7,000m² irrigation reservoir into a...
Boston Golf Course 10th Hole Redesign – ABBCO Project

Boston Golf Course 10th Hole Redesign – ABBCO Project

Project Showcase Strategic Golf Course Pond Project Showcase Strategic Golf Course Pond Boston Golf Course 10th Hole Redesign – ABBCO Project ABBCO, led by owner Morgan, transformed the 10th hole at Boston Golf Course. The redesign makes the hole more strategic,...
Somerset Natural Swimming Pond | Gartenart Project

Somerset Natural Swimming Pond | Gartenart Project

Project Showcase Natural Swimming Pond Project Showcase Natural Swimming Pond Somerset Natural Swimming Pond | Gartenart Project This incredible Somerset natural swimming pond covers 600m² and was completed by Gartenart Swimming Ponds, one of the UK’s leading...
Ellicar – Natural Swimming Pond 

Ellicar – Natural Swimming Pond 

Project Showcase Natural Swimming Pond Project Showcase Natural Swimming Pond Ellicar – Natural Swimming Pond  Set in the heart of rural Shropshire, this project began with a blank canvas—a bare paddock. Our clients wanted to transform the space into a...